I have recently negotiated the first architectural / railing project I have had in quite some time.
The project is for a set of exterior railing sections, attached to a series of large natural limestone slabs which descend down the side of a private home, from street level at the front to the walk out basement level of the back yard.
View from the lower level, original suggestion of elements |
The individual slabs are quite wide, in the lower section each from 18 - 24 inches wide. The typical lift between steps is 6-7 inches (so the thickness of the slabs as well)
The customers wanted the design of the railing units to echo the lines of a piece of sand blasted glass set into their front door:
After considerable discussion, they decided they wanted a larger number of short sections (total seven at 14 inches each) placed on individual slabs, rather than the two medium length pieces I had originally suggested. There is one two step section for the front steps into the main entrance, plus one longer section at the top part of the rear side, where the stone slab steps are much closer together. That piece has a bend in the middle to match the line of the slabs :
The handrail parts are made from 1 inch heavy walled square tube, which is flattened down on the diagonal to 1/2 tall by 1 1/2 wide, with the ends capped :
sample piece (here with curved end) of the proposed handrail |
The uprights are made from 1/4 x 2 inch flat bar. Each is drawn out to a long taper down to 3/8 x 1/2 at the narrow end, over the entire length. This is in the range of 32 - 34 inches long, depending where they fit to the design, some longer elements in the layout for the longest rail section.
You can see this is basically a clean lined 'Arts and Crafts' style design overall.
Now comes the slogging part.
The overall project requires forging out a total of 45 individual tapered pieces from flat stock.
After two days of working, I have found it takes me 30 minutes each to forge the tapers. The effective heating cycle allows for forging three pieces at a time. Completing six pieces (so all together with prep and cutting, 3 1/2 hours heavy work) is about what is sustainable for me right now. *
working sequence of forged elements |
For my initial test, I started with a piece 42 inches long, drawing the required taper on one end. This to give me an adequate cold end to hang on to. The rough forging is done on the air hammer, with evening and straightening done after by hand. In the image above, that test piece has been cut to the average for the individual elements at 32 inches.
For the production sequence, the starting bars are cut to 52 inches, enough for one taper on each end. After the first taper is completed, this stretches the bar to 62 inches as shown. With two tapers complete, the bar reaches 72 inches total (better to have a bit too much material - than not enough).
group of three pieces in the forge, one end already tapered |
As you might guess, manipulating pieces up to six feet long poses problems in a normally tight working space. Because delays pushed the ability to start this work from the start of June to the start of July, summer heat now becomes an important consideration. For that reason, I have set up my twin burner propane forge at the entrance overhang into the workshop, placing the (considerable!) heat generated outside the building. The air hammer is set up just inside the door that is where that image was shot from, about 10 feet away from the forge.
main workshop floor, looking towards entrance (1) |
Hand smoothing out the lumps and evening out is done on the large fixed anvil seen to the right in the image above. Ensuring the lines are straight is being done by forging against the heavy layout table seen in the lower left. (The top is a piece of 4 x 8 foot by 3/8 thick plate which permits this).
My intent is to produce six finished tapers each working day until I have all these elements complete = a total of 8 days. I fully expect NOT to be able to maintain that pace straight through without a break. *
* Now officially a 'senior', I just 'ain't the man I once was'. Three hours serious forge work, added to the usual additional three plus hours every day for writing and other shop related tasks, is about what I can manage on anything like sustained basis.
1) that image was prepared for a commentary on 'Distancing at the Wareham Forge'. It shows the workshop set up for a typical training course here, with an additional anvil (just left of centre) and extra leg vice (normally set back against the right side near the larger anvil).
No comments:
Post a Comment