This project, initiated back in late May, was way too long in completion.
Original Concept - Top Side Railing |
The project included a set of seven small railing pieces, mounted on a series of natural limestone steps running down the side of the house from the front to a much lower back yard, with one longer segment set at the top level. Another short piece mounted at the front entrance single step up. The design 'Arts & Crafts', inspired by patterned glass set into the front door. For a fuller commentary on the design aspect, see : Inspiration, Art - and slogging
Front Entrance Railing - note pattern on door glass |
Side Top Unit - compare to layout above |
Side Railing Set - looking upwards over the stone steps |
Those who have been following my architectural work will notice the similarity in design to an earlier project, Richard's House - 2009, also in Arts & Crafts style.
This is the first architectural project I have had for some time now. Truth to be told, there was more delay involved in both starting and completing this work, partially due to fitting the build and install around other previously committed projects. A major complication was due to simple aging. First * I * most certainly do not work as quickly as a was once able, and even during this build found a serious decline in ability. (At the start in June, I was able to complete six of the long tapers in three hours, by October this was down to half that production speed in a forging session.) My equipment also showed it's age over this work. I had failures of my air hammer, industrial welder, bench grinder, and problems with two corded electric drills during the last installation.